項目開發流程,適用上汽通用!

GPS:Global Purchasing System 全球採購系統

GPSC:Global Purchasing & Supplier Chain 全球採購及供應鏈

GR&R:Gage Repeatability and Reproducibility 檢具重複性及再現性

Greenfield Site: A new supplier facility that is built to support aprogram.

GVDP:Global Vehicle Development Process 全球整車開發流程

IPTV:Incidents per Thousand Vehicles 每千輛車故障

IVER:Integration Vehicle Engineering Release 集成車工程發佈

KCC:Key Control Characteristics. It is a processcharacteristic where variation can affect the final part and/or the performanceof the part. 關鍵控制特性

KCDS:Key Characteristic Designation System 關鍵特性指示系統

Kick-OffMeeting: The first APQP supplier program review. 啟動會議(第一次APQP供應商項目評審)

KPC:Key Product Characteristic. It is aproduct characteristic for which reasonably anticipated variation couldsignificantly affect safety, compliance to governmental regulations, orcustomer satisfaction. 關鍵產品特性

LAAM:(General Motors) Latin American, Africa & Meddle East (通用汽車)拉丁美洲、非洲及中東

LCR:Lean Capacity Rate. It is the GM dailycapacity requirement. 正常生產能力

MCR:Maximum Capacity Rate. It is the GM maximum capacity requirement. 最大生產能力

MOP:Make or Purchase 製造/採購

MPC:Material Production Control 物料生產控制

MPCE:Material Production Control Europe 歐洲物料生產控制

MRD:Material Required Date; date material must be delivered in order to allow abuild event to begin. 物料需求日期

MSA:Measurement Systems Analysis 測量系統分析

MVBns:Manufacturing Validation Build non-saleable 非銷售車製造驗證

MVBs:Manufacturing Validation Build saleable 銷售車製造驗證

NBH:New Business Hold 停止新業務

N.O.D.:Notice of Decision 決議通知

OEM:Original Equipment Manufacturer 主機客戶

PAD:Production Assembly Documents 生產裝配文件

PC&L:Production Control & Logistics 生產控制&物流

PDT:Product Development Team 產品開發小組

PFMEA:Process Failure Modes and Effects Analysis. It is used to identify potential failure modes associated with themanufacturing and assembly process. 過程失效模式和後果分析

PPAP:Production Part Approval Process 生產件批准程序

Ppk:Performance index for a stable process 過程能力指數

PPM:1) Program Purchasing Manager, 2) Parts per Million (rejects and returns tosuppliers) 1)項目經理 2)每百萬件的產品缺陷數

PPV:Product & Process Validation 產品及過程驗證

PQC:Product Quality Characteristic 產品質量特性

PR/R:Problem Reporting & Resolution 問題報告及解決

PSA:Potential Supplier Assessment, a subset of the Quality System Assessment (QSA) 潛在供應商評審

PV:Product Validation 產品驗證

QSA:Quality System Assessment 質量體系評審

QSB:Quality Systems Basics 質量體系基礎

QTC:Quoted Tool Capacity 工裝報價能力

RASIC:Responsible, Approve, Support, Inform, Consult 負責、批准、支持、通知、討論

R@R:Run at Rate 按節拍生產

RFQ:Request For Quotation 報價要求

RPN:Risk Priority Number related to FMEA development 風險順序數

RPNReduction Plan: An action plan that describes what is being done to reduce therisk priority number for items listed in the DFMEA or PFMEA. 降低RPN值計劃

SDE:Supplier Development Engineer 供應商開發工程師

SFMEA: System Failure Mode and Effects Analysis 系統失效模式分析

SMT:System Management Team 系統管理小組

SOA:Start of Acceleration 加速開始

SORP:Start of Regular Production 正式生產

SPC:Statistical Process Control 統計過程控制

SPO: (General Motors) Service and PartsOperations (通用汽車)零件與服務分部

SQ: Supplier Quality 供應商質量

SQE:Supplier Quality Engineer 供應商質量工程師

SQIP:Supplier Quality Improvement Process 供應商質量改進過程

SSF:Start of System Fill 系統填充開始

SSTS:Sub-system Technical Specifications 子系統技術規範

Sub-Assembly/ Sub-System: An assembly of sub-components delivered to the SGM mainproduction line for installation to the vehicle as a single unit.

Subcontractor:The supplier of a sub-component to a Complex System/Subassembly supplier (Tier2, 3, etc). 分供方

SVE:Sub-System Validation Engineer 子系統驗證工程師

SVER:Structure Vehicle Engineering Release. 結構車工程發佈

TeamFeasibility Commitment: An AIAG APQPform that is provided with the Request for Quotation. It is the supplier’s concerns with the feasibility ofmanufacturing the part as specified. 小組可行性承諾

TKO:Tooling Kick-Off 模具啟動會議

UG:Unigraphics UG工程繪圖造型系統

VLE:Vehicle Line Executive 車輛平臺負責人

VTC:Validation Testing Complete 驗證試驗完成

WO:Engineering Work Order 工程工作指令